Module · Production line balancingProduction line balancing against customer takt
Enter operation times and the load chart shows each station against the customer takt and highlights the bottleneck. You move operations between stations yourself and instantly see whether the line meets takt.
What the module does
Line parameters and customer takt
Customer takt (TTZ) is calculated from the available shift time and the customer requirement. A status panel shows in green or red whether the line covers it.
Line layout
Main stations form the line in series, feeder stations supply it. Cards are placed freely on the canvas.
Moving operations by hand
You move operations between main and feeder stations yourself. The load is recalculated instantly.
Load chart
Every station against the customer takt, with the bottleneck and the TTZ limit marked.
Labour cost
The cost of staffing the line is calculated from the number of operators and their rate.
Original state and proposals
The original state stays saved. You can save several proposals and return to them.
What it looks like in the app
How to proceed
Enter the line parameters
Available shift time and the customer requirement set the takt the line is judged against.
Build the line and enter times
Add main and feeder stations and enter the operations with times for each.
Move operations and watch the chart
After every move you see which station is above takt and whether the line meets the requirement.
Try it in simulation first.
Model your workplace and let Leanař calculate how much output is asleep in it.